RENEW FOUNDATION PERMIT

This service enables the Economic Cities applicant to continue construction works within this permit scope, which will only include foundation and piling works. Other works, such as basement construction, are not allowed to commence under this permit.

  • Developer
  • Business
    Applicant:
  • Appointment letter of Project Parties
  • Contractor’s all risk insurance policy
  • Prequalified Design Consultant:
  • Updated Foundation Engineering Package (Foundation, Structural System, Columns and Sheer Walls, Loads Calculation, Towers Crane, Pilings).
  • Design Consultant Compliance Letter.
  • Designs must conform to the approved local area plan and to the design guidelines and croquis, which are attached to the agreement between the Master Developer/owner and the investor.
  • Design packages must be submitted by a design consultant prequalified by the Economic Cities Authority.
  • Design packages must be submitted in Adobe PDF format
  • Compliance certificates must be stamped and submitted in Adobe PDF format
  • Documents must be valid at the time of submitting the case (three months before expiry date).
  • Complete the service ‘Issue Foundation Permit’.
  • 5 working days on complete application that fulfills all terms and conditions
  • Customers can resume the work scope of Foundation Permit and start the process of Issue Building Permit that is a main service required to start construction Inside an Economic City

Related Services

Templates and Forms

Contact Us

  • Address
  • Bay La San - 7082 Unit 2
  • King Abdullah Economic City 23964 - 2522 KSA

Copyright © ECZA 2017. All rights reserved. Powered by ECZA | Bay La San - 7082 Unit 2 King Abdullah Economic City - 23964 - 2522 KSA

Copyright © ECZA 2017. All rights reserved. Powered by ECZA | Bay La San - 7082 Unit 2 King Abdullah Economic City - 23964 - 2522 KSA

+966 12 610 6700